A 2.4 kW, 6-panel starter system in Willits / El Jebel using Q.PEAK DUO 405 W panels, installed in 2024.

Not every solar project has to be big. This El Jebel-area home in Willits added a 2.4 kW system with 6 Q.cells Q.PEAK DUO 405 W panels, a right-sized start that can grow later.
SoL Energy sized the array to the homeowner's goals and roof, then handled permitting and the utility connection.
2.4 kW
Number of Panels: 6
Panels: Q. cells Q. peak duo 405W
Residential
2024
Willits, Garfield County, Colorado

Our focus on quality and customer satisfaction ensures we exceed expectations on every project. Get a free proposal today.